Project Nathan · office + music room · 326 × 257 cm

After Hours

A boardroom by day. A late-night listening room after six. One walnut line, one dark colour, one velvet wall.

8.4 m²floor, 260 cm ceiling
2guitars, 1 new microphone
€5,000budget ceiling
5–6 Decinstall weekend
The idea

Six moves, no clutter

The room does three jobs by changing its mood, not its furniture. Everything sits on the walls or floats, so the floor stays open.

The Ribbon desk

One continuous solid walnut L at desk height. The work end runs the full length of the window; the music end turns the corner under the guitars. Nathan rolls from emails to his interface without getting up. A warm LED line underneath makes it float.

A big desk and the music corner become one piece.

Espresso drench

Walls, skirting, both doors and the radiator in one deep brown. In daylight it reads warm and tailored; at night the edges of the room disappear and only walnut, brass and guitars catch the light.

The cheapest move with the biggest effect.

Guitar gallery

A walnut slat panel centred on the back wall, two guitars hung on it like art. Two brass wall lights on the existing light points flank it and graze light across the slats. It is also what people see behind Nathan on video calls.

Instruments become the room's artwork.

Velvet wall

Floor-to-ceiling oxblood cotton velvet, made to measure and lined, across the whole window wall on a hidden wall-mounted track. The desk stands 10 cm off the wall so the velvet falls behind it to the floor. Open by day. Closed, it blocks the view from outside, cuts the glass echo and makes the desk a recording spot.

Privacy, blackout and acoustics in one pull.

The hidden door

The technical-storage door gets the same walnut slats and an acoustic seal. It disappears into the corner and keeps the heat-pump hum out of recordings.

A door becomes a feature.

Room to lean back

With the desk against the walls, the middle of the room stays open for a large reclining desk chair. Nathan faces the daylight; the blinds take the glare. On video calls his background is the walnut-clad hidden door.

Space to lounge, not just to sit.
Build it

Tick it, watch the room change

Untick something and it leaves the room. Upgrades change the look. Everything here is non-IKEA and checked on Dutch or EU shops.

Selected total€0
ItemPrice
Top view · from above

Install

Paint first, then the night shift

Paint needs dry walls before anything is mounted, so the week runs in order. Items with longer delivery go in a second, smaller round.

Phase 1 · this week

  1. Sun 29 NovOrder everything marked in stock; order the made-to-measure items now.
  2. Mon 30 NovEmpty the room, remove the Billy and the low cabinet, sand and fill.
  3. Tue–WedPaint walls, doors, skirting, radiator: two coats.
  4. Thu–FriLet it cure. Collect the walnut L-top (ask the workshop for Friday), clad the storage door.
  5. Sat 5 DecDesk + walls: wall cleats, steel legs and the walnut L-top, slat panel, guitars, wall lights, curtain track.
  6. Sun 6 DecRoom: chair, rug, LED line, cable tray, light scenes. First test recording.

Phase 2 · when it lands

    Before you order

    Things to check

    Can the walls be painted?In a rented home, ask first. A deep brown needs two coats of a light primer to go back.
    The L-desk is heavySteel legs at the open ends, a wall cleat along both walls, fixed into brick or concrete, not plasterboard. Leave 10 cm behind the window leg for the velvet and cables.
    The storage doorSlat cladding adds a few kilos: check the hinges carry it. A small door stop keeps the door clear of the right-hand brass light.
    Microphone typeUSB or XLR? An XLR mic needs the audio interface upgrade.